Welcome to ganga expressway website
The Ganga Expressway Project was launched by Uttar Pradesh Chief Minister Mayawati after coming to power in 2007. The project aims to construct a 1047 km access controlled eight-laned expressway running along the Ganga river. This expressway will connect Greater Noida to Balia thus ensuring high speed connectivity between the Eastern and Western boundaries of Uttar Pradesh. The project is expected to be completed in the next four years

Technical Data
The expressway has been divided into four sectors:
| Route | Links | Length | Cost of Construction | Date of Completion |
|---|---|---|---|---|
| Greater Noida to Fatehgarh | Farrukhabad | 253 km | Rs. 7,631 crore | TBA |
| Fatehgarh to Dalmau (Raibareli) | Lucknow | 305 km | Rs. 8,012 crore | TBA |
| Dalmau (Raibareli) to Aurai (Bhadohi) | Mirzapur | 211 km | Rs. 6,124 crore | TBA |
| Aurai (Bhadohi) to Balia | None | 278 km | Rs. 8,058 crore | TBA |
Ganga Expressway Project
Jaiprakash Associates Ltd’s wholly owned subsidiary, Jaypee Ganga
Infrastructure Corporation has signed the concession agreement with
Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) for
the prestigious 1,047 km long eight lane access controlled Ganga
Expressway from Greater Noida to Ballia on March 23, 2008 and has also
deposited a Bank Guarantee of Rs 1,491 crore towards the same. The
proposed expressway from Ballia to Greater Noida and passing through
Varanasi, Mirzapur, Allahabad, Pratapgarh, Rae Bareli, Unnao, Hardoi,
Farrukhabad, Shahjahanpur, Badaun, Bulandshahr, is to be 155 metre
wide, including the width of the embankments and service roads. The
expressway which is divided into four packages of approximately 250 km
each, had attracted 19 bidders during the pre-qualification round
including Reliance Energy, Unitech, Gammon etc. Jaiprakash Associates
Ltd was awarded the Ganga Expressway project as its combined bid for
the four packages of the project was the lowest. The project was
awarded to JAL in January 2008.
Benefits
Travel time
The 1,047 km expressway, which promises to reduce travel time from
Ballia to Noida to about ten hours.
Real estate development
The project aims to develop regions all along the proposed stretch by
opening up ten major economic and development zones of 4-5 thousand
acres each. The infrastructure facilities like electricity, water,
roads, health services, educational institutions and housing will be
provided in these areas. In the development zone, industries will be
established in Ten thousand acres.
Flood solution
This project will be constructed on the embankments on the left bank of
the river Ganga. These place are flood prone. The proposed road stretch
will protect approximately 3.40 lakh hectare land from flooding, which
currently yields single crop. These areas are expected to cultivate
multi-crop once the project gets completed. Hence, thousands of farmers
will be able to reap benefits of at least double crop.
Areas to benefit
36 Tehsils of 19 districts will benefit from the Ganga Express-way.
These include Sadar, Dalmau, Lalganj, Salon and Unchahar tehsils of
RaiBareli district, Bighapur and Sadar tehsils of Unnao district,
Jamania and Mohammadabad tehsils of Ghazipur district, Sadar tehsil of
Varanasi district, Kunda tehsil of Pratapgarh district, Soraon,
Phoolpur, Handia, Karchana, Meja and Sadar tehsils of Allahabad
district, Sadar, Kayamganj and Amritpur tehsils of Farrukhabad
district, Dataganj, Sahaswan, Gunnaur and Badaun tehsils of Badaun
district, Sadar, Bansdeeh, Beria tehsils of Ballia district, Gyanpur
and Aurai tehsils of Bhadoi district, Khurja, Dibai, Shikarpur tehsils
of Bulandshahar district, Sandila, Bilgram, Savaijpur tehsils of Hardoi
district and Jalalabad tehsil of Shahjahanpur district. Apart from
these, Etah, Kannauj, Kanpur Dehat, Kanpur Nagar, Kaushambi and
Mirzapur districts will also benefit from this.
Financials
The concessionaire is expected to be leased around 7,000 ha of land for
commercial development in order to construct the expressway. Jaypee had
sought land worth Rs 293.55 crore for property development along the
expressway in order to construct the expressway. Jaypee had asked for
minimum development rights out of all the bidders.
Implementing agency
Uttar Pradesh Expressway Industrial Development Authority (UPEIDA)
SPV
Jaypee Ganga Infrastructure Corporation Ltd
Concession period
35 years
Length / Width
1047 km / 155 mtr wide
Cost
Rs 30,000 crore
No of lanes
Eight
Completion period
Four years
Connectivity
Balia to Greater Noida
Status
The alignment plan for the expressway has been submitted to the
Government of Uttar Pradesh for approval.Once approval is received,
ground survey will be initiated and land acquisition process will
start. Financial closure is expected within 7-8 months period and work
would commence thereafter simultaneously in all 16 districts.
Population expected
7-8 lakh persons expected to reside or work in the developed area all
along the stretch
Construction
The construction of the expressway is going to be done under a Public-private partnership model. The UP government has accepted bids from various infrastructure companies. The Uttar Pradesh government has awarded the controversial Rs 30,000 crore Ganga Expressway contract to Jaypee Infratech Pvt. Ltd even as one of the bidders is considering a legal challenge. [3]. The company with the winning bid will be given a 35 year period to extract toll. The companies which had submitted the bids included:
- DLF Universal
- GMR group
- Jaypee group
- Larsen & Toubro
- Omaxe- GVK- Nagarjuna
- Reliance Energy
- Unitech Group
The project is being developed under consultancy from SREI Infrastructure Finance Ltd and the Indian Railways’ consultancy firm RITES. The construction is anticipated to be started by April 2008.
The project for which approximately 631.1 square kilometres has been earmarked has seen stiff opposition from the central Congress government and local farmers alike. 70% of the land earmarked for the project is agricultural land and only about 10% is currently with the UP government. Mayawati has announced major sops for the farmers whose land will be lost to the project. The sops include free residential properties, upwards of Rs. 35,000 cash and quota allotment in jobs and residential properties
Time Line
| date | title | description |
|---|---|---|
| 06.09.2007 | Expressway Announced |
Ganga Expressway an Rs 40,000 crore project connecting Noida and Ballia has been announced by UP Chief Minister Mayawati |
| 15.01.2008 | Work Awarded to Jaypee Group |
|
ganga expressway, expressways in up, mayawati dream project, ganga express highway, express highway map, ganga highway map, gaganga highway real estate, agriculture land ganga expressway, noida to balia, new expressway, expressways in uttar pradesh, ganga expressway development authority, expressway development, real estate along ganga expressway, jaypee ganga expressway, expressway development in uttar pradesh, uttar pradesh expressways authority, ganga expressway authority, express highway farm lands, expressway alignment plans, expressway airport, kmp expressway, eastern peripheral expressway, expressway authority of india, uttar pradesh development, mega road projects in up, up road projects, expressway projects in india